sigg12_300x400.png_product
Mouse over image to zoom
Thumbnail 1
http://legendaclocks.com/images/stories/virtuemart/product/resized/time-impacta.jpg
http://legendaclocks.com/images/stories/virtuemart/product/resized/time-impactb.jpg
http://legendaclocks.com/images/stories/virtuemart/product/resized/time-impactc.jpg

Time Impact

PDFPrint
Rating: Not Rated Yet

• Reinforced Concrete & Stainless steel Large Wall Clock
• Limited addition Wall Clock
• Swiss movements with 7 years warranty

Human behavior, thoughts, goals, and actions are all related to one question "WHEN?" We are all greatly affected by time restrictions; here time is represented by the steel sheet.

A perfect mix of classic design and modern technology resulted in the amazing Legenda Signature wall clock! This clock is made of reinforced concrete and stainless steel, giving it a unique texture and finish. This material is formed by mixing concrete in timber or metal in a cage of steel reinforcement.

No matter the styling, color scheme, or type of decor in your home, with this timepiece you will be able to locate the perfect wall clock that will express your own, unique personality.

• Material: Reinforced concrete & stainless steel
• Dimensions: 70x88 cm
• With Swiss movements Sculptured Art Handmade timepiece

Shipping: 12 to13 business days

Brand: Legenda clocks

There are yet no reviews for this product.

Sign up for newsletter

Get in Touch

B2B Showroom #. 130 - First Floor, KML
Business Bldg, Meydan Road, Al Qouz,
Sheikh Zayed Street, Exit 47, Dubai, U.A.E

Call: +971 4 3385182

Fax: +971 4 3790064

Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Quick Contact

We do accept

Top of Page